- As a part of Swing Operation, the AIT Phase-III arrival hall was
commissioned as Domestic Arrival w.e.f 07.04.2009. Once the Customs Department
is ready with their baggage scanning machines, this will be used for
International arrival also on swing basis.
- Bus Lounge for the International arrival passengers was commissioned on
08.05.2009. Subsequently, the same lounge was started utilizing w.e.f
08.06.2009 for the benefit of Int'l Departure passenger too.
- Completion of In-line baggage scanning system at the cost of Rs.11 Crores
at International Departure. The system will be commissioned after completion of
training for Security Personnel.
- The state-of-art travellator i.e. auto walker is being installed at a cost
of Rs.4.18 Crores with a length of 300 mtrs. for the first time in Indian
Airports and was commissioned on
- Additional area has been created in the ground floor security hold area of
domestic terminal for the convenience of the passengers.
- Free pick up and drop services have been arranged through car rental
services from auto drop points.
- Chennai Airport has entered into mutual aid agreement with 13 Nursing Homes
/ Hospitals for Disaster Management / Aircraft exigencies.
- Maintaining UNITY POWER FACTOR, thereby an incentive of Rs. 62.77 Lacs
received from TNEB. during the Year 2008-2009. During 2009-10 (up to Oct), a
sum of Rs. 44.71 Lacs received from TNEB as incentive for maintaining the Unity
Power Factor.
- The computer system at Air Cargo Terminal has been upgraded from 8i to 10g
Oracle database system which is facilitating the Web based EDI system to work
very efficiently.
EXPANSION/ MODERNISATION PLAN (MEGA PROJECT):
Though various modification/expansion works have been undertaken both at
terminals as well as apron area, since the existing passenger terminals and
cargo complex have already saturated and in order to meet the growing demand,
the following modernization/expansion programme have already been
initiated.
-
Extension of secondary
Runway:
In order to augment the Apron/Runway capacity to cope with increase in
aircraft movements, proposal for parallel runway had been initiated.
Accordingly, the State Government was approached for land acquisition of
1069.99 acres on the northern side of Adyar River. Out of which, initially, the
State Government has handed over 126.59 acres of land.
The existing length of runway 12-30 is 2085 Mtrs. After extension of the
runway, the total length will be 3117 mtrs. To extend this runway length, a
bridge is being constructed across the Adyar River for a length of 200M and
width of 447.5 M. This is the first such major bridge across the river in India
designed to handle A-380 aircraft and the work is nearing completion.
-
Construction of Phase - II
Domestic Terminal:
New Domestic Terminal is being constructed adjacent to the existing terminal
on the eastern side. The new terminal will have an area of 67,700 Sqm with all
modern facilities.
-
Expansion of International
Terminal:
The International Terminal is being extended on the western side of the
existing terminal. The new expansion will have an area of 59,300 Sqm.
Both the terminals will have world class steel & glass as its structure
with state-of-the-art modern passenger facilities/amenities of international
standards such as Passenger Boarding Bridges with Visual Docking System,
Central Air-conditioning, Escalators/Lifts, Inline Baggage Conveyor System
(both at arrival & departure), CCTV. Flight Information Display System,
Multi-level car park etc
Salient Features:-
| Facilities |
Existing |
Proposed |
| Domestic Terminal |
| Area |
19250 Sqm |
67700 Sqm |
| Annual Passenger Capacity |
6 Millions |
10 Millions |
| Peak hour Passenger Capacity |
2000 Passengers |
3300 Passengers |
| Aerobridges |
3 Nos. |
6 Nos. |
| Check-in Counters |
53 |
62 Nos. (including 7 e-ticketing) |
| Baggage Conveyor Belts |
4 |
6 Nos. (70 m each) |
| Car Park Capacity |
600 Cars & Taxis |
1200 Cars & Taxis |
| International Terminal |
| Area |
42300 Sqm |
59300 Sqm |
| Annual Passenger Capacity |
3 Millions |
4 Millions |
| Peak hour Passenger Capacity |
2100 Passengers |
2300 Passengers |
| Aerobridges |
5 Nos. |
6 Nos. |
| Check-in Counters |
46 |
72 Nos. (including 5 e-ticketing) |
| Baggage Conveyor Belts |
04 |
4 Nos. (70 m each) |
| Immigration/Customs counters (Arrival) |
22/16 |
19/10 Nos. |
| Immigration/Customs counters (Departure) |
16/2 |
19/6 Nos. |
| Car Park Capacity |
1000 Cars & Taxis |
1200 Cars & Taxis |
-
Construction of Cargo Complex -
Phase - III:
At present, the import cargo is being handled from various sheds made on
emergency basis. In order to bring all the import activities under one roof and
to meet the growing demand, Construction of Integrated Cargo Complex
(Phase-III) is under progress with an area of 26,000 Sqm. The new complex will
have Vertical Storage Space, Automatic Storage and Retrieval System (ASRS) as
special features.
Last updated on - 16 August 2010