| International Projects |
 |
|
|
|
| Libya: New Ghat Airport Project |
|
Client
|
Libyan Govt
|
|
Consultant
|
Italconsult, Italy
|
|
Cost
|
US $70.20 Million
|
|
Commencement
|
January 1976
|
|
Completion
|
April 1979
|
| |
|
Construction of main runway 3600mtr x 45mtr; secondary
runway 1500mtr x 30 mtr; Parallel taxiway 3700mtr x 30 mtr; Aprons (2 nos.)
200mtr x 100mtr terminal and other building with public address system,
air-field lighting, peripheral road, internal roads and Air force camp. The
adverse geographical location of the site posed logistics problems for movement
of construction machinery and material over large desert areas and AAI's
engineers were able to resolve these.
|
 |
| The work was completed in record time. Libyan
authorities were so satisfied with the planning, execution and quality of the
work "Ghat Airport Project" that they entrusted Brat Project to AAI
without taking recourse to call of tenders. |
|
| Libya: Brak Airport Stage - I |
|
Client
|
Libyan Govt
|
|
Consultant
|
Italconsult, Italy
|
|
Cost
|
US $25.17 Million
|
|
Commencement
|
June 1978
|
|
Completion
|
April 1982
|
| |
|
Construction of main runway 2500mtr x 30mtr; Parallel
taxiway 960mtr x 30mtr; Aircraft Parking Apron, Powerhouse Building, Peripheral
Roads and chain link fencing. The geographical location of the site posed
logistics problems of movement for construction machinery and material over
large desert areas and AAI's engineers were able to resolve these.
|
|
| Libya: Brak Airport Stage - II |
|
Client
|
Libyan Govt
|
|
Consultant
|
Italconsult, Italy
|
|
Cost
|
US $41.60 Million
|
|
Commencement
|
June 1982
|
|
Completion
|
April 1985
|
| |
|
Extension of runway 1350mtr x 45mtr; secondary runway
1600mtr; x 30mtr; Parallel taxiway 2600m long; Parking apron, Internal Roads,
Chain link fencing etc.
|
|
| Yemen: Riyan Airport |
|
Client
|
Republic of Yemen
|
|
Consultant
|
Kocks GMBH, Germany
|
|
Cost
|
US $25.69 Million
|
|
Commencement
|
November 1979
|
|
Completion
|
May 1982
|
| |
|
Construction of runway, link taxiway, apron, terminal
building, cargo and other ancillary buildings including bulk services,
air-field lighting etc. Construction material such as cement bitumen etc.,
including plant and machinery was transported by the barges for timely
completion of the work. The entire project was executed in-house by AAI using
latest equipment and machinery. The local available materials were largely used
for keeping the project cost within the stipulated limit.
|
|
| Yemen: Alghaidha Airport |
|
Client
|
Republic of Yemen
|
|
Consultant
|
Kocks GMBH, Germany
|
|
Cost
|
US $23.64 Million
|
|
Commencement
|
June 1983
|
|
Completion
|
December 1986
|
| |
|
After successful completion of Riyan Airport Project, the
Govt. of Yemen awarded the consultancy contract to AAI for Algidha Airport
followed by construction contract. The project included construction of runway,
link taxiway, apron, administrative blocks, terminal and other ancillary
buildings. The construction materials such as cement, bitument, including plant
& machinery were required to be transported by sea.
|
|
| Algeria: Batna Airport |
|
Client
|
Republic of Algeria
|
|
Consultant
|
AAI
|
|
Cost
|
US $0.51 Million
|
|
Commencement
|
June 1982
|
|
Completion
|
December 1984
|
| |
|
This was consultancy project for development of Airport in
Batna, Algeria. The scope of work included preparation of detailed
reconnaissance, topographic survey, hydrological investigations, development of
airport master plan and detailed engineering drawings, design of air-field
pavements, foundation engineering for ground improvement, design of drainage
system, design of air-field lighting and visual aids system. Design of air-side
operational roads and design of city side traffic circulation system, roads and
parking areas. Preparation of bill of quantities, cost estimate and tender
document. The scope of work also included planning for navigational aids and
fuel farm.
|
|
| Algeria: Setif Airport |
|
Client
|
Republic of Algeria
|
|
Consultant
|
AAI
|
|
Cost
|
US $1.10 Million
|
|
Commencement
|
June 1982
|
|
Completion
|
December 1984
|
|
|
|
This was consultancy project for development of Airport in
Setif, Algeria. The scope of work included preparation of detailed
reconnaissance, topographic survey, hydrological investigations, development of
airport master plan and detailed engineering for ground improvement, design of
drainage system, design of air-field lighting and visual aids system. Design of
air-side operational roads and design of city side traffic circulation system,
roads and parking areas. Preparation of bill of quantities, cost estimate and
tender document. The scope of work also included planning for navigational and
communication aids and fuel farm.
|
|
| Maldives: Hulule Airport |
|
Client
|
Government of Maldives
|
|
Consultant
|
Kocks GMBH, Germany
|
|
Cost
|
US $11.00 Million
|
|
Commencement
|
April 1978
|
|
Completion
|
November 1981
|
|
|
|
Extension & resurfacing of runway, construction of
apron, terminal building, control tower, fuel tank, water supply, drainage and
sewerage facilities etc. Construction was completed under difficult logistics
and adverse climatic conditions besides this, building materials and machinery
were also transported by sea. The runway extension was on reclaimed land on
coral base.
|
|
| Yemen: Alghaidha Airport |
|
Client
|
Republic of Yemen
|
|
Consultant
|
AAI
|
|
Cost
|
US $23.64 Million
|
|
Commencement
|
April 1981
|
|
Completion
|
July 1986
|
|
|
|
Consultancy of design of runway, link taxiway, apron,
administrative blocks, terminal and other ancillary buildings. This consultancy
project for design aspects ultimately was converted by Republic of Yemen into a
turn-key project for airport development.
|
|
| Nauru: Design / Preparation / Documents for Extension of Runway |
|
Client
|
Republic of Nauru
|
|
Consultant
|
AAI
|
|
Cost
|
US $96,000
|
|
Commencement
|
January 1982
|
|
Completion
|
January 1983
|
|
|
|
The existing facility at airport were not adequate for the
safe operation of wide-bodied aircraft and it required extension of runway on
reclaimed land from shallow sea.
The scope of work consisted of two components:
- The first part was to study the requirements, design the armour wall and
design runway pavement for extension.
- The second part was to prepare documents included preparation of bill of
quantities for tendering etc., for project implementation by Govt. of
Nauru
|
|
| Mauritius: Improvement & Modernisation of Plaissance Airport |
|
Client
|
Govt. of Mauritius
|
|
Consultant
|
AAI
|
|
Cost
|
US $40,000
|
|
Commencement
|
March 1984
|
|
Completion
|
March 1986
|
|
|
|
AAI undertook the feasibility study for improvement and
modernization of Plaisance Airport in Mauritius, including air field pavements,
air field lighting and on acceptance of the report, AAI deputed its specialists
in the field of Civil & Electrical engineering for advising/consultancy to
the executing agency during construction/implementation of the project
scheme.
|
|
| Tanzania: Mafia Airport |
|
Client
|
Govt. of Tanzania
|
|
Consultant
|
AAI
|
|
Cost
|
US $0.016 Million
|
|
Commencement
|
April 1981
|
|
Completion
|
July 1982
|
|
|
|
The project included development work including preparation
of report, detailed engineering drawing and other associated documents.
|
Last updated on - 01 January 2010
|
|  |
|